Phasing Landscape Design Services in Renton, WA Across Two or Three Seasons

Phasing Landscape Design Services

Few homeowners build an entire property at once, and landscape design services in Renton, WA are perfectly workable in stages if the plan is drawn for the whole yard first. 

The mistake is not phasing. The mistake is phasing without a plan, which is how a patio ends up sized for a structure that will not fit and a bed gets torn out to run a line that should have been sleeved the first year.

A phased plan is also a budgeting tool. It lets a household commit to a design once and spend against it over two or three seasons rather than deciding everything under time pressure.

Carlos Morales Sr. started this company more than twenty years ago, and what began as a father and son caring for local properties in Renton is now a team working across the Seattle metropolitan area. That continuity matters more on a phased build than on any other kind of project.

Related: What a Landscape Designer Does and Why It Matters in Renton, WA

What Has To Be Designed Before Phase One Is Built?

The whole yard, at least in layout. Grades, circulation, drainage and the footprint of every future element need to be settled even if only a quarter of it gets built this year. Those four decide where water goes and how the spaces connect, and they cannot be revised later without touching work already paid for.

Our landscape design process resolves the full property on paper, then breaks it into buildable stages.

As for what belongs in the first phase, the rule is anything that later phases would have to dig through. Drainage, sleeving under paved surfaces, irrigation mains, and conduit for lighting all belong in the first excavation because they are cheap while the ground is open and expensive afterwards. 

Retaining and grade work usually belongs early too, since almost everything else sits on the grades it establishes. Planting, lighting fixtures and structures can wait.

How Does The Puget Sound Climate Affect The Order Of Phases?

Wet ground limits when heavy work can happen without damaging the site, so excavation and hardscape are generally scheduled for the drier stretch of the year.

Planting is the opposite. Fall establishment gives roots months of moisture before any summer stress, so sequencing a phase to put the hard work in late summer and the planting behind it in autumn tends to produce a better result than doing both in June.

Does Phasing Cost More Overall, And How Do You Keep A Plan On Track?

Somewhat more, because a crew mobilizes more than once and material prices move between years. What that buys is a design decided once and built correctly, rather than a yard assembled feature by feature with no plan behind it.

Homeowners who build in stages against a plan generally spend less than those who build all at once and then rework parts of it. The saving comes from not undoing anything.

Keeping it on track takes two things: a current drawing and the same team. A plan revised as the household changes is a live document rather than a folder in a drawer, and the crew that installed phase one already knows what is buried under phase two. 

Our design and construction process carries the same team through both, which removes the handover that usually loses the detail.

Related: How We Create a Landscape Design Plan for Seattle Homes: Our Process at North East Landscaping Services

Draw The Whole Yard, Build It When You Are Ready

If the property needs more work than this season's budget allows, the answer is a design for the whole yard and a build broken into stages you can commit to one at a time. We will walk the site, produce a plan with renderings, and tell you plainly what belongs in the first excavation. 

North East Landscaping Services provides landscape design and construction for homeowners in Renton, Bellevue and across the Seattle area.

In Summary

How long can a phased landscape plan stay valid before it needs redrawing?

A few years, provided the household's use of the yard has not changed much and no structures have been added. We review the plan before each phase begins, since site conditions and plant sizes shift over time.

Can a different contractor build a later phase of the same design?

Technically yes, though the risk is what is buried. Sleeving, drainage runs and base depths installed in phase one need to be documented and understood, so the plan and the as-built notes have to travel with the job.

What is a realistic size for a first phase in Renton, WA?

It varies with the property, but a workable first phase usually covers the grading, drainage and the primary paved area, since those set up everything else. Planting and lighting make sensible second and third phases.